Добавить проект
Прочитать правила
Платный доступ
Авторизация:
Информация


Иностранные чертежи » Другие страны : СВ Crushing and screening plant

СВ Crushing and screening plant

| Рб:
1
| Платформа: АutoCad | Поместил: ist | Дата: 18.8.17 08:32 | Год выпуска: 2014 | Размер: 2.17 MB | Скачали: 0
Коротко о файле: Building construction (foundations, steel structures) crushing plant. The engineering design conforms to the standards, codes and regulations of the People’s Republic of China with the main codes.Project overview and general rules. This project is crushing workshop. The indoor ±0.000 of the project is equivalent to absolute elevation of 403m. The structural system is concrete. The service life of major structure design in this project is 50 years. / Content: set of 15 sheets of drawings of building structures.
СВ Crushing and screening plant

The wind velocity pressure in 50 years in this area is 0.80KN/m, and the ground roughness is B. The seismic fortification category of the engineering construction is Class C. The seismic intensity is seven degrees. The design earthquake of the site is in the first group with the venue category of II. The indoor ±0.000 of the project is equivalent to absolute elevation of 403m. Ⅱ. Design of building foundation 1. fk=200kPa is determined tentatively as the characteristic value of foundation bearing capacity. The base should be located on the stable layer, and should exceed local maximum frozen depth.
The single foundation under column is used for the project.
When starting to dig foundation trench, stability of slope should be paid more attention to. When non-natural step-slope excavation starts, the encasing of foundation trench should be specially designed, and the original break ground should not be changed. Unless, the parts disturbed should have the treatment of C15 rubble and concrete pouring in order to get to the designed elevation; the design, construction and supervisor parties should agree if using other method, mechanical digging should follow relevant regulations, 200mm thickness of soil layer should be reserved for hand excavation.
Before foundation construction, drill exploration and trench inspection should be conducted. If the earth quality does not conform to geology report, construction, design, and supervisor parties should have a joint consultation to discuss the treatment method.
100mm thickness, C15 concrete mat layer should be set under concrete foundation slab (except the noted ones), the width around the mat layer of the base is 100mm wider than that of the base.
Both sides of backfill should be at the same time after foundation construction, the backfill located under the base and equipment foundation, ground, wash apron foundation, step foundation must be tamped layer by layer, the thickness of each layer is no more than 300mm, pressure coefficient should be 0.94 or above.
Water cement ratio should be controlled strictly during construction, Strengthen maintenance and take reasonable construction process.

Statement of working drawings
1.General data
2.Table of contents
3.Plan at elevation.0.000-7.200
4.Plan at El.+5.100, section a-a
5.Plan of foundations
6.The Foundation of SJ-1(1)
7.The Foundation of SJ-1(2)
8.The Foundation of the SJ-2(2)
9.The Foundation of the SJ-2(2)
10.Building construction site crushers
11.Design of vibrating screen and conveyor 107
12.Design of a belt conveyor 105
13.Design of a belt conveyor 106
14.Design of a belt conveyor 108
15.Metal structures of service platforms


Содержимое архива

Проекты (работы, чертежи) можно скачать став участником и внеся свой вклад в развитие. Как скачать ? подробнее >>>>>>>
 
Cloudim - онлайн консультант для сайта бесплатно.